Skip to product information
Safety Wash Bottles, Vol.500ml, 6PCS of Lab Rinse Squeeze Bottles, Printed Acetone, Ethyl Alcohol, Methanol, Isopropanol, Distilled Water, Sodium Hypochloride, LDPE Material, IN-WBS001
$65.98
Shipping calculated at checkout.
About This
- Capacity: 6pcs of 500ml (17oz), each 1PC of acetone wash bottle , Ethyl alcohol wash bottle , Methanol wash bottle, Isopropanol wash bottle, Distilled water wash bottle and Sodium hypochloride wash bottle.
- O.D×Height: 2.91’’×7.2’’(74mm×183mm), the diameter of mouth is 1.36’’ (34.5mm)
- Material: Bottle is made of LDPE(Low Density Polyethylene) material which has good flexibility, elasticity, and impact resistance, draw tube is made of PP(Polypropylene).
- Superiority: High sealing performance, effectively prevent the volatilization of liquid
- Appearance: These wash bottles have a label with chemical name, the chemical formula of the International Chemical Society (ICS) and the Chemical Abstract Service (CAS) number.
Overview
- Brand : LABINVO
- Material : Plastic
- Bottle Type : Wide mouth bottle
- Color : Safety Wash Bottles, 6PCS
- Capacity : 500 Milliliters